Prevent dropped objects in the workplace: Barrier Panel System

Barrier panel system was first installed for CPPS Unit B3 Boiler during the Oct 2018 Outage, since then, we have installed for Units B1, B2, B3 Boilers and BPPS Unit C5 HRSG and Turbine. Approximately total 7,500m length have been insulated against falling objects.

 

Share on facebook
Facebook
Share on linkedin
LinkedIn
Share on twitter
Twitter
Share on skype
Skype
Share on whatsapp
WhatsApp
Share on telegram
Telegram
Share on email
Email