Prevent dropped objects in the workplace: Barrier panel system

Barrier panel system was first installed for CPPS Unit B3 Boiler during the Oct 2018 Outage, since then, we have installed for Units B1, B2, B3 Boilers and BPPS Unit C5 HRSG and Turbine. Approximately total 7,500m length have been insulated against falling objects.